OCPP (Open Charge Point Protocol) is the common language an EV charger uses to talk to the software that manages it: it reports that a car has plugged in, how many kWh it delivered and whether there is a fault, and it receives commands such as starting a session or lowering power. It is maintained by the Open Charge Alliance, and since 2024 its version 2.0.1 has been the international standard IEC 63584.

In Chile, the SEC's technical standard RIC No. 15 requires every public charger to report its status, energy delivered, power and errors «through the communication protocol OCPP 1.6 or higher». For a company or fleet that wants to bill, control and share charging between several units, management software and OCPP are the foundation.

The SEC's requirements for operators
3 minMaximum latency to report a change
30 daysDeadline to integrate a new charger
80%Public charging integrated into the platform90% of fast charging
View the data as a table
Maximum latency to report a change3 min
Deadline to integrate a new charger30 days
Public charging integrated into the platform80%

What OCPP is and which versions exist

OCPP connects two pieces: the charger and the charging station management system (CSMS), usually in the cloud. Because it is open, a charger from one brand can work with another company's software, and the owner can change software provider without replacing the hardware, as long as both are certified on the same version.

VersionYearWhat it adds
OCPP 1.62015SOAP and JSON variants; smart charging with charging profiles and load balancing; local user lists
OCPP 2.02018First version of the new generation, later replaced by 2.0.1
OCPP 2.0.12020Device management, better transactions, more security, ISO 15118 support and display messages; IEC 63584 standard since 2024
OCPP 2.12025Bidirectional charging (V2X) with ISO 15118-20, distributed energy resource control, local cost calculation, card payment and dynamic QR codes

Source: Open Charge Alliance, checked on 10 November 2026. Version 1.6 is still the most widely used in installed equipment; 2.0.1 and 2.1 are the ones to ask for in new purchases, especially if bidirectional charging is on the horizon.

Charging protocols, one by one
OCPPCharger and management softwareStart and stop sessions, meter kWh, limit power1.6 or higher, mandatory for public charging (RIC No. 15)
OCPI 2.2.1Operator, service providers and SECPublish sites, status and rates; roamingMandatory to report to the SEC platform
ISO 15118Car and chargerPlug and Charge and bidirectional chargingSupported by OCPP 2.0.1 and 2.1
PLC / PWMCar and chargerPilot control: low- and high-level signallingDefined in RIC No. 15

How charger management software works

Charger management software does four jobs. First, it controls access: it decides who can charge, with an RFID card, an app or a QR code. Second, it meters and logs each session, with the kWh and times the charger sends over OCPP. Third, it bills: it applies a rate and invoices the user or splits the cost between cost centres. Fourth, it manages power: it limits or shares the available kW among the connected cars.

FunctionWhat it doesExample in a company or fleet
Access controlAuthorises users by RFID, app or QROnly fleet vehicles charge at night; by day, visitors pay
MeteringLogs kWh, start and end of each sessionKnowing how much each van uses
Billing and ratesApplies a price per kWh, per minute or a fixed feeCharging staff who top up their own cars
Power managementLimits and shares kW between chargersNot exceeding the contracted capacity of the connection
MonitoringFault alerts and real-time statusMaintenance before a bus leaves uncharged
ReportingEnergy, cost and emissions reportsAccounting and sustainability reports

Source: Energía Futura, based on the OCPP functions described by the Open Charge Alliance and offers published by suppliers in Chile. The state of the public network these platforms report to is laid out in our report on EV charging stations in Chile 2026.

Red electric bus of the RED system stopped at a bus stop on the Alameda
An electric bus of the RED system in Santiago. RED's electric fleet reached 3,849 buses in 2025, according to the SEC. Photo: Igallards7 / Wikimedia Commons (CC BY 4.0).

How to share charging between chargers: power management

This is the function that saves the most money. If a company installs ten 22 kW chargers, without management it would need 220 kW of capacity. With a load management system (SGC), RIC No. 15 allows a private installation to be sized with a demand factor of 0.5 to 1 in the 10 to 120 kW band, and 0.3 to 1 from 120 kW. With a factor of 0.5, the installed power declared falls to 110 kW.

What a load management system saves on the grid connectionExample: ten 22 kW chargers in a private car park (kW of installed power)
Source: SEC, Technical Standard RIC No. 15, 2024 version, Table No. 15.1; Energía Futura calculation
View the data as a table
No load management (factor 1)220 kW
With management, factor 0.7154 kW
With management, minimum factor 0.5110 kW

Technically, the software uses OCPP charging profiles (available since version 1.6) to tell each charger how many amps it may deliver at any moment. RIC No. 15 distinguishes two systems: the SGC, which lowers power according to the capacity of the chargers' switchboard, and the SPA, which does so according to the capacity of the main service entrance when there are several connections. In buildings, the standard requires charger power to be manageable remotely by both, as explained in our guide to EV chargers in condominiums and apartment buildings.

  • Even split: available power is divided among the connected cars.
  • By priority: vehicles leaving first or with less battery get more power.
  • By schedule: more charging at the hours of lowest price or lowest building demand.
  • With connection metering: a meter at the service entrance reports in real time how much power is left, as home load managers do.

How to bill charging: rates and payment methods

In public charging, the SEC sets how prices are reported. Under its Interoperability Instruction, updated by Exempt Resolution 41,458 and published in the Official Gazette on 23 September 2026, the service provider must label each charge as «Fixed Fee» (CLP), «Energy» (kWh), «Time of Use» (minute) or «Power» (kW), in Chilean pesos, and may set a minimum or maximum price.

How Chile's public chargers bill todayReported price components, per connector
Source: Public charger registry, SEC and Ministry of Energy, accessed 10 Nov 2026; Energía Futura calculation
View the data as a table
Energy (CLP per kWh)1,486
Fixed fee per session129
Time (CLP per minute)2
Connectors with no reported rate840

In the public charger registry, checked on 10 November 2026, billing by energy dominates: it appears on 1,486 connectors, against 129 with a fixed fee (almost all at CLP 0) and only 2 with per-minute billing. Another 840 connectors report no rate. The instruction also requires at least one payment method at a public charger to be cash, debit or a web portal, with no need for the user to register or have a prior agreement.

Price componentUnitConnectors with that component (Nov 2026)When it is used
EnergyCLP per kWh1,486The most common and the easiest to compare
Fixed feeCLP per session129 (almost all at CLP 0)Covering transaction costs
Time of useCLP per minute2Discouraging cars from blocking the charger
PowerCLP per kW0Billing by contracted power

Source: public charger registry (SEC and Ministry of Energy), 10 November 2026; Energía Futura calculation. In private charging at a company, billing is free: the kWh can be charged at cost to staff, allocated to each cost centre or included in a charging-as-a-service contract.

Does your company develop charging software or manage chargers for fleets? Reach Energía Futura's readers.

See advertising formats

OCPP in Chile: what the SEC requires from operators

If the chargers are publicly accessible, besides talking OCPP to its software the operator must connect to the SEC's Interoperability Platform, which has been running since 17 November 2024. That link does not use OCPP but OCPI 2.2.1 (Open Charge Point Interface), the protocol for exchanging sites, statuses and rates between operators and platforms. The cargadorespublicos.cl map and the EcoCarga app are fed by that platform.

Obligation under the SEC instructionDeadline or detail
Report each status change of a charger or connectorMaximum latency of 3 minutes
Integrate a new public charger into the platform30 calendar days from energisation
Update data after amending the TE615 calendar days
Report each connector's available powerIf a charger has simultaneous connectors
Availability measurement for each connectorFrom 1 January 2027; no minimum required in the first two years
Report of energy delivered (kWh)From 1 January 2027, by region and charging type; the first one covering 2026

Source: SEC, updated Interoperability Instruction (2026), sections 9 and 10. According to the SEC's National Report, about 80% of public infrastructure and 90% of fast and ultra-fast charging were already integrated into the platform.

From OCPP 1.6 to Chile's 2027 obligations
  1. 2015OCPP 1.6Adds smart charging with charging profiles and JSON.
  2. 2020OCPP 2.0.1Device management, more security and ISO 15118 support.
  3. 2024IEC 63584 and RIC No. 15OCPP 2.0.1 becomes an IEC standard; in Chile, RIC No. 15 requires OCPP 1.6 or higher for public charging.
  4. 17 November 2024SEC Interoperability PlatformOperators report status and prices via an OCPI 2.2.1 API.
  5. 2025OCPP 2.1Bidirectional charging (V2X), distributed energy control and card payment.
  6. 23 September 2026Updated instructionSEC Exempt Resolution 41,458.
  7. 1 January 2027Availability and energyThe SEC starts measuring each connector's availability and operators report the kWh delivered.
Row of high-power fast chargers in a motorway car park
High-power fast chargers at a service area. Public chargers in Chile must communicate over OCPP 1.6 or higher. Photo: Tomás Freres / Wikimedia Commons (CC BY-SA 4.0).

How to choose charger management software

In Chile, several companies offer management software with their chargers or on its own: Enerlink sells charge management software and charging as a service; ElectroChile offers management, control and billing software at no cost to its clients; CHASS handles booking, payment and tracking from its app; and Copec Voltex bills building users through the Copec app. The full list is in our guide to EV charger companies in Chile.

  • Certified OCPP version: ask for the Open Charge Alliance certificate for the chargers and the software, ideally 2.0.1.
  • Portability: confirm the chargers can be reconfigured to another platform if you change supplier.
  • Power management: it should support charging profiles and connection metering.
  • SEC integration: if charging is public, the supplier should already be integrated with the platform via OCPI.
  • Pricing model: price per charger, per session or a share of revenue, and who issues the receipts.
  • Data: access to session logs and exports for accounting and emissions reporting.

Frequently asked questions

What is OCPP?

It is the Open Charge Point Protocol, an open protocol chargers use to communicate with their management software. It is maintained by the Open Charge Alliance and its version 2.0.1 is standard IEC 63584.

Is OCPP mandatory in Chile?

Yes, for public charging: RIC No. 15 requires OCPP 1.6 or higher. It is not mandatory for private charging, but it lets you change software without replacing hardware.

What is the difference between OCPP and OCPI?

OCPP connects the charger with its software; OCPI connects platforms with each other, for example an operator with the SEC or with third-party apps. In Chile the SEC uses OCPI 2.2.1.

How is power shared between several chargers?

With a load management system that uses OCPP charging profiles to cap each unit's amps so the connection's capacity is not exceeded.

How is public charging billed?

By energy, time, fixed fee or power, in pesos. In November 2026, 1,486 public connectors billed per kWh and only 2 per minute.

What changes in 2027?

From 1 January 2027 the SEC measures the availability of every public connector and operators must report the kWh they deliver.