LATESTKerosene in Chile rises CLP 54 a litre from Thursday 26 and is up CLP 360 since October, while gasoline and diesel stay frozenChile's grid reform bill to reach Congress in early 2027Chile curtails 200 GWh of solar and wind power in one week as the grid operator plans a tender to reinforce the northCNE declares Zaldívar pipeline under construction
ENERGÍA FUTURA
Energy Efficiency

Electricity service connection in Chile: single or three-phase, how to upgrade it, what it costs and the TE1

By ·

Electricity service connection in Chile: single or three-phase, how to upgrade it, what it costs and the TE1

The service connection, called *empalme eléctrico* in Chile, is the set of cables, protective devices and box that connects the distribution company's grid to your home's meter. Chile's electricity regulator, the SEC, defines it in technical code RIC No. 01 as the elements linking the customer's metering unit to the distribution network. Its capacity sets how much power you can draw at once: a common 25-amp single-phase connection allows 5 kW.

When the main breaker trips as soon as the oven, kettle and heater run together, or when an electric car charger or heat pump is installed, what is usually missing is connection capacity. Upgrading it is a service with a regulated price: Energy Ministry Decree 2T of 2026 sets the rates, and in Chilquinta's area upgrading a single-phase overhead connection costs CLP 28,836 to 29,389 including VAT. This guide explains how it works, what it costs and what the TE1 certificate is for.

A home's service connection in figures
5 kWCommon home connectionsingle-phase, 25 A
8 kWTop size in BT1 tariffsingle-phase, 40 A
CLP 29,389Upgrade, single-phase overhead6 to 10 kVA, Chilquinta
CLP 194,731New single-phase overhead connection+ CLP 2,256 per metre, Chilquinta
View the data as a table
Common home connection5 kW
Top size in BT1 tariff8 kW
Upgrade, single-phase overheadCLP 29,389
New single-phase overhead connectionCLP 194,731

What an electricity service connection is and what it is made of

The connection starts at the utility's pole (or underground vault) and ends at the connection box, the enclosure that houses the meter. From there the feeder runs to the home's electrical panel. Its parts are:

  • Service drop: the cable from the pole to the house. It can be overhead (concentric) or underground.
  • Protection or limiter: a circuit breaker that trips if the contracted capacity is exceeded. Its amp rating sets the connection's power.
  • Connection box: the cabinet holding the meter. RIC No. 01 requires impact resistance (IK 09) and, if exposed to the sun, UV protection.
  • Meter: records the energy. It belongs to the utility or the customer, depending on the case.
Row of electricity meter boxes with their protective devices on a wall
Connection boxes with their meters and protective devices, the point where the utility's grid ends. Photo: Loadmaster (David R. Tribble) / Wikimedia Commons (CC BY-SA 3.0).

Single-phase or three-phase connection: how much power each provides

A single-phase connection uses one phase and neutral at 220 V; it is what the vast majority of homes have. A three-phase one uses three phases at 380 V and is for large motors, workshops, irrigation pumps, fast EV chargers or homes with heavy loads. Annex 1.3 of RIC No. 01 sets the standard capacities according to the connection's breaker:

How much power each single-phase connection providesContracted power in kW by the connection's breaker, in amperes
View the data as a table
6 A (A-6)1.0 kW · BT1
10 A (A-6)2.0 kW · BT1
16 A (A-6)3.0 kW · BT1
20 A (A-6)4.0 kW · BT1
25 A (A-6)5.0 kW · BT1
30 A (A-9)6.0 kW · BT1
32 A (A-9)6.5 kW · BT1
35 A (A-9)7.0 kW · BT1
40 A (A-9)8.0 kW · BT1
50 A (A-16)10.0 kW · residential tariffs other than BT1
63 A (A-16)13.0 kW · residential tariffs other than BT1
Breaker (A)Contracted power (kW)Maximum power (kVA)Connection typeTariff
611.3A-6 / S-6BT1
1022.2A-6 / S-6BT1
1633.5A-6 / S-6BT1
2044.4A-6 / S-6BT1
2555.5A-6 / S-6BT1
3066.6A-9 / S-9BT1
326.57.0A-9 / S-9BT1
3577.7A-9 / S-9BT1
4088.8A-9 / S-9BT1
501011A-16 / S-16Residential other than BT1
631313.8A-16 / S-16Residential other than BT1

The letter A stands for overhead and S for underground. According to the same table, single-phase connections up to 40 A (8 kW) fall under the BT1 tariff, Chile's basic residential rate; those of 50 and 63 A move to residential tariffs other than BT1. For three-phase, the table starts at 3.6 kW (6 A) and goes up to 612 kW (1,000 A).

To work out how much power you need, add up the appliances that run at the same time: a 2,000 W kettle, a 2,000 W heater and a 1,500 W oven already total 5.5 kW, above what a 25 A connection provides. An electricity usage meter helps you see how much each appliance draws before asking for more capacity.

How to upgrade your electricity service connection step by step

Decree 2T defines a connection capacity upgrade as adapting or replacing the connection's protective devices to raise the available power. It includes disconnection and reconnection, inspection, technical studies and the new protective devices. It does not include the meter, replacing the connection's conductor or municipal fees, and the customer must first file the indoor installation declaration with the SEC and present it when requesting the service.

  • 1. Check the indoor wiring: an SEC-licensed electrician confirms that the panel, conductors and protective devices can handle the new power, and adapts them if needed.
  • 2. Declare the installation (TE1): the electrician files the commissioning declaration for the indoor installation on the SEC's e-Declarador platform.
  • 3. Request the upgrade from the utility: with the TE1 and a bill, you apply at the utility's branch or website.
  • 4. Protection change and reconnection: the utility replaces the limiter with a higher-capacity one and charges the regulated rate.
  • 5. If moving from single to three-phase: it is no longer an upgrade but a new connection, with another meter and conductor.

If the upgrade is to charge an electric car in an apartment building, there are specific metering and co-ownership rules; we explain them in our guide to chargers in condominiums and buildings.

What the TE1 is and why it is required for the connection

The TE1 is the commissioning declaration of an indoor electrical installation filed with the Superintendency of Electricity and Fuels (SEC). It is submitted by an SEC-licensed electrician on the e-Declarador platform, according to the official ChileAtiende guidance. It certifies that the home's wiring complies with the RIC technical codes. Without a TE1 the utility will not connect a new service or upgrade an existing one, because the decree requires the declaration to be filed before the service is requested.

The cost of the TE1 is not regulated: the electrician charges for it, and it covers the inspection, measurements and drawings. It is therefore worth getting more than one quote and checking that the person holds a current SEC licence in the class matching the installation's power.

Electricity meters under eaves on a building in Corral, Los Ríos Region, Chile
Electricity meters under eaves in Corral, Los Ríos Region. The service connection ends at the meter box. Photo: Draceane / Wikimedia Commons (CC BY-SA 4.0).

How much it costs to upgrade or install an electricity service connection

These prices are not set by each company: they are fixed by Decree 2T of 2026, published in the Official Gazette on 10 April 2026, with indexation formulas, and each utility publishes its table. As an example we use Chilquinta's, in force since 1 June 2026, including VAT. A new connection has a fixed charge and a variable charge per metre, covering labour and the conductor.

What the utility charges for a connection: Chilquinta exampleChilean pesos incl. VAT, from 1 June 2026; the variable charge is per metre of connection
5.1.2Capacity upgrade, single-phase overhead, up to 6 kVA28,8360
5.1.3Capacity upgrade, single-phase overhead, 6-10 kVA29,3890
5.2.2Capacity upgrade, single-phase underground, 6-10 kVA30,1930
5.3.1Capacity upgrade, three-phase overhead, 6-20 kVA52,2770
5.3.2Capacity upgrade, three-phase overhead, 20-50 kVA56,2750
9.1.2New connection, single-phase overhead, up to 6 kVA194,7312,256
9.1.3New connection, single-phase overhead, 6-10 kVA189,6152,256
9.2.1New connection, single-phase underground, up to 6 kVA267,43115,205
9.3.1New connection, three-phase overhead, 6-20 kVA666,5662,706
9.3.2New connection, three-phase overhead, 20-50 kVA688,2113,873
9.4.1New connection, three-phase underground, 6-20 kVA1,138,81121,340
Service (Chilquinta, from 1 June 2026)Fixed chargePer metreTotal with 15 metres
Capacity upgrade, single-phase overhead, up to 6 kVACLP 28,836—CLP 28,836
Capacity upgrade, single-phase overhead, 6-10 kVACLP 29,389—CLP 29,389
Capacity upgrade, three-phase overhead, 6-20 kVACLP 52,277—CLP 52,277
New connection, single-phase overhead, up to 6 kVACLP 194,731CLP 2,256CLP 228,571
New connection, single-phase underground, up to 6 kVACLP 267,431CLP 15,205CLP 495,506
New connection, three-phase overhead, 6-20 kVACLP 666,566CLP 2,706CLP 707,156
A new 15-metre connection: cost by typeFixed charge plus 15 metres of variable charge, CLP incl. VAT (Chilquinta). 1P = single-phase, 3P = three-phase
View the data as a table
1P overhead ≤6 kVACLP 228,571 · New connection, single-phase overhead, up to 6 kVA
1P overhead 6-10CLP 223,455 · New connection, single-phase overhead, 6-10 kVA
1P underground ≤6CLP 495,506 · New connection, single-phase underground, up to 6 kVA
3P overhead 6-20CLP 707,156 · New connection, three-phase overhead, 6-20 kVA
3P overhead 20-50CLP 746,306 · New connection, three-phase overhead, 20-50 kVA
3P underground 6-20CLP 1,458,911 · New connection, three-phase underground, 6-20 kVA

On top of these amounts come the items the service does not cover: the meter if it needs replacing, tree trimming, breaking and repairing pavement, trenches for an underground connection, municipal fees and the electrician's indoor work, including the TE1. At other utilities the figures differ because the decree sets values by company and area, but the list of services and the way they are charged are the same. Before requesting the upgrade, the electrician checks the panel: we explain how power is split between circuits in our guide to the home electrical panel.

One tip before paying for an upgrade: check whether the problem is capacity or usage. If the main breaker trips only when two or three large appliances coincide, it is sometimes enough not to run them together; if a circuit breaker trips but not the main one, the problem is in that circuit, not in the connection. Raising contracted power can also make the bill more expensive under tariffs that charge for capacity, unlike BT1.

Are you an electrician or electrical services company? Reach Energía Futura's readers.

See advertising options

Frequently asked questions

What is an electricity service connection?

It is the link between the utility's grid and the home's meter: the cable, protective devices and box. Its capacity, in amps, sets how much power can be used at once.

How many kW does a 25-amp single-phase connection give?

5 kW of contracted power and 5.5 kVA of maximum power, according to annex 1.3 of the SEC's RIC No. 01. A 40 A one gives 8 kW.

How much does it cost to upgrade the connection?

At Chilquinta, upgrading a single-phase overhead connection costs CLP 28,836 to 29,389 including VAT, and a three-phase overhead one CLP 52,277 to 56,275, from 1 June 2026. The electrician's work and the TE1 are extra.

Who files the TE1?

An electrician with a current SEC licence, who submits it on the e-Declarador platform. Customers cannot file it themselves.

Is it worth switching from single to three-phase?

Only if you have three-phase equipment or need more than single-phase provides (13 kW at 63 A). It is a new, more expensive connection: CLP 666,566 plus CLP 2,706 per metre for Chilquinta's overhead version.